Loading…
$11.50M
Existing building with industrial characteristics suitable for repurposing
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
Scored using engine v1 · 11/14/2026
Nearest Substation
UNKNOWN8497
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
This 33-acre industrial campus in Clewiston delivers 154,950 square feet of concrete and steel warehouse construction with one megawatt of power from Glades Electric, positioned on State Road 80 with direct routing to I-75 and US-27 for efficient access to Miami, Fort Myers, Tampa, and Orlando. The facility includes 25-foot ceiling heights, dock-high loading areas, and 21,600 square feet of refrigerated space, alongside a 3,600-square-foot professional office building and substantial yard capacity for staged equipment or future expansion. Fully fenced with three gated entries, the site sits in Flood Zone X and operates on onsite well and septic systems. The property's heavy power infrastructure, ample acreage, and central Florida location provide a convertible platform for power-intensive deployment or large-scale regional operations.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.