Building 5 is operational. We expect a 5th building because there's enough land cleared for one. We assume a roughly 6-month delay between building operation, based on previous building estimates.
Power (MW)
474.0
IT Power (MW)
395.0
H100-equiv
320,364
Cap-Ex ($B)
$15.15
Buildings Operational
5.0
Water (MGD)
—
Notes
Google’s Omaha data center is their second in Nebraska, following a site in Papillion. We estimate its compute capacity primarily based on satellite and aerial imagery of the cooling towers, which are documented in a draft air permit.
- [Draft basis of air permit with details of cooling towers](https://drive.google.com/file/d/1KN7o-wQOyt1UEud8wpM8PymXJF479r0n/view?usp=sharing)
- Google’s [2025 Environmental Report](https://sustainability.google/reports/google-2025-environmental-report/)