Microsoft Project Osmium, which is now fully completed, is a 5-building campus located in Iowa. We believe only four of the buildings are used for AI, starting with the second completed building [containing ~25k A100s used by OpenAI to train GPT 3.5 (per SemiAnalysis reporting)](https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed). Power capacity was derived from a SemiAnalysis figure from the [same report](https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed), and was estimated as identical across buildings due to near-identical structures. Although one building has chillers, we don’t believe they cover full cooling capacity. Other cooling methods are likely used in addition.
- [SemiAnalysis article with IT power estimations and detailing usage by OpenAI for training GPT 3.5](https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed)
- [DCD Article on site expansion](https://www.datacenterdynamics.com/en/news/microsoft-granted-permit-for-new-data-center-in-des-moines-iowa/)
- [MISO Announcement reporting power for newest buildings, likely an overestimate](https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf)