All frontier sites
Microsoft Fairwater Atlanta
Microsoft
United States
Microsoft AI WAN
1435 Hwy 54 W, Fayetteville, GA 30214
Current Power
859 MW
H100-equivalents
741,313
Capital Cost
$23.49B
Energy Provider
Georgia Power
Site Location
Tenants / Users
OpenAI #speculative
Construction Timeline · 4 events
2023-04-09
2026-05-14
2026-05-14
Status
Building 3 and 4 are operational.
Power (MW)
859.0
IT Power (MW)
613.0
H100-equiv
741,313
Cap-Ex ($B)
$23.49
Buildings Operational
4.0
Water (MGD)
—
Notes
Microsoft Fairwater Atlanta is a QTS-built data center with Microsoft as a tenant, possibly for the purpose of providing compute to OpenAI. We estimate compute for it primarily based on satellite and aerial imagery of the chillers.
Sources
Calculations sheet
- [2023 Air Permit application](https://drive.google.com/file/d/1p7aY9syz319IcEuyukgIIvzmhTNKRS6p/view?usp=sharing) - [YouTube video with aerial views](https://www.youtube.com/watch?v=44eWesI-174) - [Semianalysis presentation](https://youtu.be/hobvps-H38o?si=wsAcRtDFG4Df4_7z&t=901) - [Bloomberg article](https://www.bloomberg.com/news/features/2024-12-08/georgia-s-blackstone-backed-qts-data-center-hits-resistance-over-ai-power-needs)
Data:
Epoch AI · Frontier Data Centers (CC-BY)