Although official [promotional sources](https://www.streamdatacenters.com/wp-content/uploads/2026/01/SDC-Goodyear-CaseStudy-251218.pdf) estimate the campus to be fully operational in 10-12 years, it is likely to be finished sooner than this given the empirical durations for other data center campuses as well as because AI building 6 has been expedited. The first AI building took approximately 24 months to complete. Assuming construction for a new building starts midway for every building, then the campus will be complete in 4 years for the 5 remaining buildings, since AI buildings 2 and 6 are both underway.
Power (MW)
267.0
IT Power (MW)
220.0
H100-equiv
160,182
Cap-Ex ($B)
$11.66
Buildings Operational
6.0
Water (MGD)
—
Notes
Stream is a Phoenix-based 7-building campus, with 6 of its projected buildings set to be AI ready.
By 2030, they aim to serve 280 MW (220 MW for AI) of IT power across the campus.
- [Official page for the data center.](https://www.streamdatacenters.com/locations/phoenix/)
- [Official pre-construction planning document.](https://www.streamdatacenters.com/wp-content/uploads/2026/01/SDC-Goodyear-CaseStudy-251218.pdf)