Estimated completion time for all 5 main AI buildings assuming construction continues at the same rate, based on the observed timelines of Buildings 2 and 3.
Power (MW)
1035.0
IT Power (MW)
863.0
H100-equiv
1,424,962
Cap-Ex ($B)
$33.04
Buildings Operational
5.0
Water (MGD)
—
Notes
Google Fort Wayne will be a five-building campus likely designed to house current and next-gen TPUs. The campus is also notable for being one of the first sites to use the new Google building design, which is larger and has more cooling infrastructure. (There is also the 'H' building which we haven't seen before, but we don't think it's for AI compute.) We estimate that when it's completed in 2028, it will consume approximately 1 GW of total facility power and produce 1.2 million H100-equivalents' worth of compute.
- [Google's plans for wetlands in Fort Wayne](https://www.thelocalfw.com/what-to-know-about-googles-plans-for-wetlands-in-fort-wayne/)
- [Data center's diesel generators](https://www.thelocalfw.com/data-center-diesel-generators/)
- [Project's history and tax abatement](https://www.thelocalfw.com/data-centers-secrecy-and-tax-abatements/)
- [City Council approval](https://citycouncildocuments.acfw.net/documents/download/2023-12-19/R-23-12-02.pdf)