Building 2 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308).
Power (MW)
941.0
IT Power (MW)
672.0
H100-equiv
1,480,546
Cap-Ex ($B)
$25.74
Buildings Operational
2.0
Water (MGD)
—
Notes
Built by Crusoe and originally planned as an expansion to Stargate Abilene for OpenAI and Oracle, this site reportedly now has interest from NVIDIA and Meta but was ultimately acquired by Microsoft.
- [Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace them](https://www.bloomberg.com/news/articles/2026-03-06/oracle-and-openai-end-plans-to-expand-flagship-data-center)
- [Air Permit Application for the buildings, featuring blueprints on p.391](https://www.tceq.texas.gov/assets/public/permitting/air/reports/applications/400428-ac.pdf) (via [Aterio](https://www.aterio.io/blog/stargate-files-for-phase-3-expansion-in-abilene))
- [Partnership Announcement with Microsoft](https://x.com/mustafasuleyman/status/2037547756320141587)