Building 4 and supporting facilities/buildings operational, whole facility now operational. Based on the [environmental analysis (page 6)](https://drive.google.com/file/d/1ft2ZzqAYZtsTqMwyML4eo_EFYuclVxE6/view?usp=sharing) filed for the site.
Power (MW)
1300.0
IT Power (MW)
902.0
H100-equiv
2,627,590
Cap-Ex ($B)
$34.56
Buildings Operational
4.0
Water (MGD)
—
Notes
The Stargate site in Port Washington, Wisconsin is one of a set of 5 Stargate sites that were [announced in tandem](https://openai.com/index/five-new-stargate-sites/). The developer of this site is Vantage, and they state the planned IT load, power density, and other features of the campus on their website. We estimate the date at which the full site is operational based on the environmental analysis filed, which splits the site into two projects. Project 1, which is the first 3 buildings, has a planned completion date of Q3 2028. Project 2, which is the last building, has a planned completion date of Q4 2028.